Visit
Official Website

Net Energy Metering (NEM)


NEM Concept
  • Energy produce from the installed solar PV system will be consumed first, and any excess will be export to TNB on “one-on-one” offset basis.
  • Applicable to Domestic, Commercial, Industrial and agriculture sector

    NEM Calculation
    FOR NEM RAKYAT & NEM GOMEN
  • Net Charge Amount (RM) = (Energy Imported from Distribution Licensee* x Gazetted Tariff) – (Energy Exported to Distribution Licensee x Gazetted Tariff) 
  • 1 kWh exported to the grid will be offset against 1kWh consumed from the grid with the gazetted tariff. The export charges are charged in descending order (start from the highest tariff rate charged on the applicable month)

    NEM available Quota
  •  500MW quota allocate for year 2017 to 2020 for Peninsular Malaysia!
  • First come First Serve Basis
Please leave your enquiry here, we will reply as soon as possible.
Name*  
Company Name  
Product Interested  
Quantity  
Email*  
Contact No.*  
Messages*